SOLAR Β· PJMSolar project AE1-220, Nelson County
Solar project AE1-220, Nelson County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Nelson County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedJun 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-220
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Coleen-Clifford 138 kV
- Location
- Nelson County, Virginia
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 24 September 2018
- Proposed online date
- June 2022
- Withdrawn
- June 2019
Location
Marker shows the centre of Nelson County; the queue data does not give exact sites.