United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

SOLAR Β· MISO

Solar project J3411, Randolph County

Solar project J3411, Randolph County is a 120 MW solar request withdrawn in the MISO interconnection queue, in Randolph County, Missouri, connecting to AMEREN MISSOURI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3411
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN MISSOURI
Connection point (POI)
5ADAIR - 5THMHIL (AECI) 161.0kV
Location
Randolph County, Missouri
Technology
Solar: 120 MW
Total requested
120 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
12 April 2024
Proposed online date
March 2028
Withdrawn
December 2025

Location

Marker shows the centre of Randolph County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Randolph County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem