GAS Β· ERCOTElk 4
Elk 4 is a 202 MW gas request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2013 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 17INR0004
- Grid region
- ERCOT (Texas)
- Developer
- Golden Spread Elec Coop
- Connection point (POI)
- Abernathy (#79506)
- Technology
- Gas: 202 MW
- Total requested
- 202 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 13 June 2013
- Proposed online date
- June 2019
Location
No county location in the queue data.