United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

ONSHORE WIND Β· NYISO

Flat Rock Windpower

Flat Rock Windpower is a 100 MW onshore wind request withdrawn in the NYISO interconnection queue, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
57
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Flat Rock Windpower, LLC
Connection point (POI)
Lowville-Boonville
Location
New York
Technology
Wind: 100 MW
Total requested
100 MW
Queue status
Withdrawn
Entered queue
21 March 2000

Location

No county location in the queue data.

Power plants in New York Β· Transmission lines in New York

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem