United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

SOLAR + STORAGE Β· MISO

Solar + storage project J3106, Pemiscot County

Solar + storage project J3106, Pemiscot County is a 500 MW solar + storage request withdrawn in the MISO interconnection queue, in Pemiscot County, Missouri, connecting to AMEREN MISSOURI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedMar 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3106
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN MISSOURI
Connection point (POI)
Dell to New Madrid 500 kV line
Location
Pemiscot County, Missouri
Technology
Solar: 500 MW Β· Battery
Total requested
500 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
August 2025
Withdrawn
March 2023

Location

Marker shows the centre of Pemiscot County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Pemiscot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem