United States βΊ Grid βΊ Interconnection queues
GAS Β· ISO-NECombined Cycle
Combined Cycle is a 222 MW gas request withdrawn in the ISO-NE interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2008 (completed)
- Withdrawn / abandonedNov 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 261
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Yarmouth Substation 115 kV bus
- Technology
- Gas: 222 MW
- Total requested
- 222 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 19 May 2008
- Proposed online date
- December 2013
- Withdrawn
- November 2008
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem