COAL Β· ERCOT

Sandow Unit 5

Sandow Unit 5 is a 30.0 MW coal request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Sep 2013 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2014 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
14INR0069
Grid region
ERCOT (Texas)
Developer
Luminant
Connection point (POI)
Sandow 170092
Technology
Coal: 30.0 MW
Total requested
30.0 MW
Study phase
IA
Queue status
Operational
Entered queue
18 September 2013
Proposed online date
October 2014
Came online
December 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem