United States βΊ Grid βΊ Interconnection queues βΊ New Jersey
SOLAR + STORAGE Β· PJMSolar + storage project AH2-200
Solar + storage project AH2-200 is a 3.0 MW solar + storage request withdrawn in the PJM interconnection queue, connecting to AEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedApr 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH2-200
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEC
- Connection point (POI)
- TBD 12kV
- Location
- New Jersey
- Technology
- Solar: 3.0 MW Β· Battery
- Total requested
- 3.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 9 March 2022
- Proposed online date
- January 2025
- Withdrawn
- April 2024
Location
No county location in the queue data.
Power plants in New Jersey Β· Transmission lines in New Jersey
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem