United States βΊ Grid βΊ Interconnection queues βΊ Wyoming
SOLAR Β· WESTSolar project C1-03, Park County
Solar project C1-03, Park County is a 9.0 MW solar request withdrawn in the West interconnection queue, in Park County, Wyoming, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C1-03
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Circuit 9H184 out of Frannie substation
- Location
- Park County, Wyoming
- Technology
- Solar: 9.0 MW
- Total requested
- 9.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 1 April 2021
- Proposed online date
- December 2025
Location
Marker shows the centre of Park County; the queue data does not give exact sites.
Other requests in Park County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem