United States βΊ Grid βΊ Interconnection queues βΊ New Jersey
OFFSHORE WIND Β· PJMOffshore wind project X1-017, Atlantic County
Offshore wind project X1-017, Atlantic County is a 720 MW offshore wind request withdrawn in the PJM interconnection queue, in Atlantic County, New Jersey, connecting to AEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2011 (completed)
- Withdrawn / abandonedFeb 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X1-017
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEC
- Connection point (POI)
- Cedar 230kV
- Location
- Atlantic County, New Jersey
- Technology
- Offshore Wind: 720 MW
- Total requested
- 720 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 28 February 2011
- Proposed online date
- September 2016
- Withdrawn
- February 2012
Location
Marker shows the centre of Atlantic County; the queue data does not give exact sites.
Power plants in New Jersey Β· Transmission lines in New Jersey
Other requests in Atlantic County
- Woods Landing Energy StorageBattery storage Β· 250 MW Β· agreement signed
- Fenwick Creek SolarSolar + storage Β· 38.0 MW Β· agreement signed
- Missouri Avenue Battery Storage ProjectBattery storage Β· 20.0 MW Β· agreement signed
- Offshore wind project AI2-431, Atlantic CountyOffshore wind Β· 2,139 MW Β· in study
- Battery storage project AI2-071, Atlantic CountyBattery storage Β· 150 MW Β· in study
- Battery storage project AI2-070, Atlantic CountyBattery storage Β· 150 MW Β· in study
- 1307 Doughty RoadSolar Β· 9.6 MW Β· built
- Borgata D1 / D2Gas Β· 8.0 MW Β· built
- Jersey Atlantic WFOnshore wind Β· 7.5 MW Β· built
- Marina Thermal FacilityGas Β· 7.5 MW Β· built
- Midtown Thermal Control CenterGas Β· 5.5 MW Β· built
- Shoreham Energy Units 1-3Other Β· 4.8 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem