HYDRO Β· SPPHydro project GEN-2015-007IS
Hydro project GEN-2015-007IS is a 2.0 MW hydro request withdrawn in the SPP interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2015 (completed)
- Withdrawn / abandonedApr 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2015-007IS
- Grid region
- SPP (Southwest Power Pool)
- Technology
- Hydro: 2.0 MW
- Total requested
- 2.0 MW
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 25 November 2015
- Withdrawn
- April 2016
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem