United States βΊ Grid βΊ Interconnection queues βΊ Colorado
SOLAR Β· WESTSolar project GI-2010-20, Rio Grande County
Solar project GI-2010-20, Rio Grande County is a 20.0 MW solar request withdrawn in the West interconnection queue, in Rio Grande County, Colorado, connecting to Public Service Company Of Colorado.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2010 (completed)
- Withdrawn / abandonedFeb 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-2010-20
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Public Service Company Of Colorado
- Connection point (POI)
- Home Lake Substation
- Location
- Rio Grande County, Colorado
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study underway Request Withdrawn 2/1/12
- Queue status
- Withdrawn
- Entered queue
- 20 December 2010
- Proposed online date
- December 2013
- Withdrawn
- February 2012
Location
Marker shows the centre of Rio Grande County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem