GAS Β· SOUTHEAST

Gas project GI-99, Butler County

Gas project GI-99, Butler County is a 470 MW gas request withdrawn in the Southeast interconnection queue, in Butler County, Missouri, connecting to Associated Electric Cooperative, Incorporated.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-99
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Associated Electric Cooperative, Incorporated
Connection point (POI)
Gobbler Knob 345 kV Bus
Location
Butler County, Missouri
Technology
Gas: 470 MW
Total requested
470 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
21 July 2022
Proposed online date
April 2026

Location

Marker shows the centre of Butler County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Butler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem