United States › Grid › Interconnection queues › Washington
ONSHORE WIND · WESTOnshore wind project G0973, Mason County
Onshore wind project G0973, Mason County is a 300 MW onshore wind request in interconnection study in the West interconnection queue, in Mason County, Washington.
- PlanningQueued Oct 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- G0973
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Olympia-Shelton No 3 230kV line.
- Location
- Mason County, Washington
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Energy only (ERIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 14 October 2023
- Proposed online date
- December 2029
Location
Marker shows the centre of Mason County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Mason County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem