United States › Grid › Interconnection queues › Virginia
SOLAR · PJMNorth Shenandoah-Stanley 34.5kV
North Shenandoah-Stanley 34.5kV is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Page County, Virginia, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2017 (completed)
- Withdrawn / abandonedAug 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AD1-085
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- North Shenandoah-Stanley 34.5 kV
- Location
- Page County, Virginia
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 15 September 2017
- Proposed online date
- September 2026
- Withdrawn
- August 2024
Location
Marker shows the centre of Page County; the queue data does not give exact sites.
Other requests in Page County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem