United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· PJM

Other project AA2-172

Other project AA2-172 is a 115 MW other request withdrawn in the PJM interconnection queue, connecting to ATSI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedJul 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AA2-172
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ATSI
Connection point (POI)
ATSI-PSEG
Technology
Other: 115 MW
Total requested
115 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Withdrawn
July 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in