United States › Grid › Interconnection queues › Mississippi
SOLAR · MISOSolar project J3590, Humphreys County
Solar project J3590, Humphreys County is a 75.0 MW solar request in interconnection study in the MISO interconnection queue, in Humphreys County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
- PlanningQueued Apr 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3590
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- BELZONI - BELZONI TAP SS 115.0kV
- Location
- Humphreys County, Mississippi
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Active
- Entered queue
- 17 April 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Humphreys County; the queue data does not give exact sites.
Power plants in Mississippi · Transmission lines in Mississippi
Other requests in Humphreys County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem