United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

SOLAR Β· MISO

Solar project J1762, Iron County

Solar project J1762, Iron County is a 22.5 MW solar request withdrawn in the MISO interconnection queue, in Iron County, Michigan, connecting to AMERICAN TRANSMISSION COMPANY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2020 (completed)
  2. Withdrawn / abandonedFeb 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1762
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMERICAN TRANSMISSION COMPANY
Connection point (POI)
Crystal Falls - Aspen 69 kV
Location
Iron County, Michigan
Technology
Solar: 22.5 MW
Total requested
22.5 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
24 June 2020
Proposed online date
September 2023
Withdrawn
February 2021

Location

Marker shows the centre of Iron County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem