United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOSouthtown 2 Solar
Southtown 2 Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2017 (completed)
- Withdrawn / abandonedJun 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 627
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- OneEnergy Development, LLC
- Connection point (POI)
- North Angola 34.5kV Substation
- Location
- New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 17 April 2017
- Withdrawn
- June 2017
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem