ONSHORE WIND Β· WESTOnshore wind project GI-0923, Mccone County
Onshore wind project GI-0923, Mccone County is a 158 MW onshore wind request withdrawn in the West interconnection queue, in Mccone County, Montana, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0923
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Ft. Peck-Dawson County 230kV
- Location
- Mccone County, Montana
- Technology
- Wind: 158 MW
- Total requested
- 158 MW
- Service type
- Energy only (ERIS)
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 6 August 2009
- Proposed online date
- December 2012
Location
Marker shows the centre of Mccone County; the queue data does not give exact sites.
Other requests in Mccone County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem