United States βΊ Grid βΊ Interconnection queues βΊ Montana
SOLAR + STORAGE Β· WESTSolar + storage project 445, Fergus County
Solar + storage project 445, Fergus County is a 20.0 MW solar + storage request withdrawn in the West interconnection queue, in Fergus County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 445
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Near Glengarry Substation
- Location
- Fergus County, Montana
- Technology
- Solar: 20.0 MW Β· Battery
- Total requested
- 20.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Feasibility Study 10/17/2023
- Queue status
- Withdrawn
- Entered queue
- 25 July 2023
- Proposed online date
- December 2026
Location
Marker shows the centre of Fergus County; the queue data does not give exact sites.
Other requests in Fergus County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem