United States › Grid › Interconnection queues › New York
SOLAR + STORAGE · NYISOUpper Falls Solar
Upper Falls Solar is a 46.0 MW solar + storage request withdrawn in the NYISO interconnection queue, in Wyoming County, New York, connecting to RG&E.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1475
- Grid region
- NYISO (New York)
- Utility / transmission owner
- RG&E
- Developer
- SR1 Shift NY I
- Connection point (POI)
- Line 907 Substation 162, Alleghany (S1185) and Houghton Substation (S180). 115kV
- Location
- Wyoming County, New York
- Technology
- Solar: 46.0 MW · Battery
- Total requested
- 46.0 MW
- Queue status
- Withdrawn
- Entered queue
- 29 November 2022
Location
Marker shows the centre of Wyoming County; the queue data does not give exact sites.
Other requests in Wyoming County
- Swiss Valley Energy StorageBattery storage · 300 MW · in study
- Highview SolarSolar · 20.0 MW · in study
- Niagara SolarSolar · 20.0 MW · in study
- Wethersfield 230kVOnshore wind · 126 MW · built
- Wethersfield 230kVOnshore wind · 126 MW · built
- High Sheldon WindfarmOnshore wind · 113 MW · built
- High Sheldon WindfarmOnshore wind · 113 MW · built
- Stony Creek Wind FarmOnshore wind · 92.8 MW · built
- Stony Creek Wind FarmOnshore wind · 92.8 MW · built
- Bliss WindfieldOnshore wind · 72.0 MW · built
- Bliss WindfieldOnshore wind · 72.0 MW · built
- Bliss II WindfieldOnshore wind · 28.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem