SOLAR Β· MISO

Solar project J2264, Prairie County

Solar project J2264, Prairie County is a 88.0 MW solar request withdrawn in the MISO interconnection queue, in Prairie County, Arkansas, connecting to ENTERGY ARKANSAS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2264
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY ARKANSAS
Connection point (POI)
Desarc(A) (500kV) -Griffithville(B) (500kV)
Location
Prairie County, Arkansas
Technology
Solar: 88.0 MW
Total requested
88.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
11 October 2021
Proposed online date
February 2024
Withdrawn
October 2023

Location

Marker shows the centre of Prairie County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in Prairie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem