United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

SOLAR Β· NYISO

Main St

Main St is a 10.8 MW solar request withdrawn in the NYISO interconnection queue, connecting to NM-NG/NYSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2017 (completed)
  2. Withdrawn / abandonedMar 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
663
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG/NYSEG
Developer
Solar Liberty Energy Systems, Inc.
Connection point (POI)
Golah - South Perry 69 kV
Location
New York
Technology
Solar: 10.8 MW
Total requested
10.8 MW
Queue status
Withdrawn
Entered queue
8 September 2017
Withdrawn
March 2018

Location

No county location in the queue data.

Power plants in New York Β· Transmission lines in New York

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem