United States βΊ Grid βΊ Interconnection queues βΊ Virginia
BATTERY STORAGE Β· PJMBattery storage project AG1-057, Middlesex County
Battery storage project AG1-057, Middlesex County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Middlesex County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2020 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-057
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Harmony Village 230 kV
- Location
- Middlesex County, Virginia
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 27 July 2020
- Proposed online date
- December 2023
- Withdrawn
- September 2023
Location
Marker shows the centre of Middlesex County; the queue data does not give exact sites.
Other requests in Middlesex County
- Drake StorageBattery storage Β· 40.0 MW Β· agreement signed
- Drake StorageBattery storage Β· 40.0 MW Β· agreement signed
- Puller SolarSolar Β· 15.0 MW Β· built
- Battery storage project AH1-364, Middlesex CountyBattery storage Β· 68.0 MW Β· withdrawn
- Church ViewSolar Β· 20.0 MW Β· withdrawn
- Solar project AH1-079, Middlesex CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AC2-163, Middlesex CountySolar Β· 17.5 MW Β· withdrawn
- Solar project AE2-268, Middlesex CountySolar Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem