Nine Canyon 2

Nine Canyon 2 is a 32.0 MW onshore wind request built and operating in the West interconnection queue, in Benton County, Washington, connecting to Energy Northwest (CGS).

Queue statusOperating
  1. PlanningQueued Sep 2001 (completed)
  2. ConsentedDec 2003 (completed)
  3. Construction (completed)
  4. OperatingTarget Nov 2007 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
G73-01
Grid region
West (non-ISO utilities)
Utility / transmission owner
Energy Northwest (CGS)
Connection point (POI)
115 kV McNary-Badger Canyon line (Nine Canyon Substation)
Location
Benton County, Washington
Technology
Wind: 32.0 MW
Total requested
32.0 MW
Service type
Energy only (ERIS)
Study phase
IA Executed
Queue status
Operational
Entered queue
18 September 2001
Agreement signed
31 December 2003
Proposed online date
November 2007

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Washington · Transmission lines in Washington

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem