United States β€Ί Grid β€Ί Interconnection queues

COAL Β· ERCOT

Mesa Power Project

Mesa Power Project is a 750 MW coal request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
11INR0008b
Grid region
ERCOT (Texas)
Developer
Mesa Power Pampa, LLC
Technology
Coal: 750 MW
Total requested
750 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 August 2007
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem