United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· SOUTHEASTSolar project LGE-GIS-2021-002, Union County
Solar project LGE-GIS-2021-002, Union County is a 150 MW solar request withdrawn in the Southeast interconnection queue, in Union County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2021 (completed)
- Withdrawn / abandonedJul 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2021-002
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- Morganfield 161kV Substation
- Location
- Union County, Kentucky
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 8 January 2021
- Proposed online date
- December 2023
- Withdrawn
- July 2021
Location
Marker shows the centre of Union County; the queue data does not give exact sites.
Other requests in Union County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem