United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· MISOSolar project J1764, Perry County
Solar project J1764, Perry County is a 125 MW solar request withdrawn in the MISO interconnection queue, in Perry County, Missouri, connecting to WABASH VALLEY POWER ASSOCIATION, INC..
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedDec 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1764
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- WABASH VALLEY POWER ASSOCIATION, INC.
- Connection point (POI)
- Seminary/Perryville 138kV
- Location
- Perry County, Missouri
- Technology
- Solar: 125 MW
- Total requested
- 125 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 24 June 2020
- Proposed online date
- September 2023
- Withdrawn
- December 2020
Location
Marker shows the centre of Perry County; the queue data does not give exact sites.
Other requests in Perry County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem