United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project J252, Audubon County

Onshore wind project J252, Audubon County is a 39.1 MW onshore wind request withdrawn in the MISO interconnection queue, in Audubon County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2012 (completed)
  2. Withdrawn / abandonedJul 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J252
Grid region
MISO (Midcontinent)
Connection point (POI)
Audobon 69 kV Substation
Location
Audubon County, Iowa
Technology
Wind: 39.1 MW
Total requested
39.1 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
10 September 2012
Withdrawn
July 2015

Location

Marker shows the centre of Audubon County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Audubon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem