United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
SOLAR Β· SOUTHEASTSolar project 924437, Union County
Solar project 924437, Union County is a 58.0 MW solar request withdrawn in the Southeast interconnection queue, in Union County, South Carolina, connecting to Duke Energy Carolinas.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 924437
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- Jordan
- Location
- Union County, South Carolina
- Technology
- Solar: 58.0 MW
- Total requested
- 58.0 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 20 September 2023
Location
Marker shows the centre of Union County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Union County
- Solar project 920665, Union CountySolar Β· 75.0 MW Β· agreement signed
- Solar project 962858, Union CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 920179, Union CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 23506, Union CountySolar Β· 74.0 MW Β· withdrawn
- Solar project 977273, Union CountySolar Β· 63.0 MW Β· withdrawn
- Solar project 126036, Union CountySolar Β· 58.0 MW Β· withdrawn
- Solar project 568024, Union CountySolar Β· 58.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem