United States › Grid › Interconnection queues

BATTERY STORAGE · WEST

Battery storage project 2023-G10.1

Battery storage project 2023-G10.1 is a 90.0 MW battery storage request in interconnection study in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusIn planning
  1. PlanningQueued Oct 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jan 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2023-G10.1
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Navajo - Glen Canyon 230kV
Technology
Battery: 90.0 MW
Total requested
90.0 MW
Study phase
In Progress
Queue status
Active
Entered queue
3 October 2023
Proposed online date
January 2026

Location

No county location in the queue data.

Power plants in · Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem