United States βΊ Grid βΊ Interconnection queues
NUCLEAR Β· ERCOTComanche Peak 3 and 4
Comanche Peak 3 and 4 is a 3,200 MW nuclear request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2006 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 15INR0002
- Grid region
- ERCOT (Texas)
- Developer
- TXU Generation
- Technology
- Nuclear: 3,200 MW
- Total requested
- 3,200 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 15 September 2006
- Proposed online date
- December 2021
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem