OTHER Β· MISOOther project J4176
Other project J4176 is a 1,750 MW other request withdrawn in the MISO interconnection queue, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedJan 2026 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J4176
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Technology
- Other: 1,750 MW
- Total requested
- 1,750 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Proposed online date
- September 2028
- Withdrawn
- January 2026