BATTERY STORAGE · MISO

Battery storage project J4030, Faulkner County

Battery storage project J4030, Faulkner County is a 200 MW battery storage request in interconnection study in the MISO interconnection queue, in Faulkner County, Arkansas, connecting to ENTERGY ARKANSAS.

Queue statusIn planning
  1. PlanningQueued May 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J4030
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY ARKANSAS
Connection point (POI)
MAYFLOWER115KV
Location
Faulkner County, Arkansas
Technology
Battery: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
29 May 2025
Proposed online date
October 2029

Location

Marker shows the centre of Faulkner County; the queue data does not give exact sites.

Power plants in Arkansas · Transmission lines in Arkansas

Other requests in Faulkner County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem