SOLAR Β· ERCOT

Greenwolfe Solar Alt POI

Greenwolfe Solar Alt POI is a 274 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0014
Grid region
ERCOT (Texas)
Developer
EDF Renewables Development, Inc.
Connection point (POI)
Tap 345 kV line from Farmersville Switch (#1685) to Cyclone Switch (#11689)
Technology
Solar: 274 MW
Total requested
274 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
15 November 2022
Proposed online date
September 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem