SOLAR Β· SOUTHEAST

Solar project 37, Bamberg County

Solar project 37, Bamberg County is a 20.0 MW solar request withdrawn in the Southeast interconnection queue, in Bamberg County, South Carolina, connecting to Santee Cooper.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
37
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Santee Cooper
Location
Bamberg County, South Carolina
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
13 March 2015
Proposed online date
April 2016

Location

Marker shows the centre of Bamberg County; the queue data does not give exact sites.

Power plants in South Carolina Β· Transmission lines in South Carolina

Other requests in Bamberg County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem