ONSHORE WIND Β· ERCOTSilver Canyon Wind B
Silver Canyon Wind B is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 12INR0002b
- Grid region
- ERCOT (Texas)
- Developer
- EDP Renewables
- Connection point (POI)
- 79503 Tule Canyon 345kV
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 3 January 2007
- Proposed online date
- October 2018