Solar project 2021-G4

Solar project 2021-G4 is a 765 MW solar request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2021-G4
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Lost Canyon - Shiprock 230-kV
Technology
Solar: 765 MW
Total requested
765 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
22 October 2021
Proposed online date
December 2023