SOLAR Β· WESTSolar project 2021-G4
Solar project 2021-G4 is a 765 MW solar request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 2021-G4
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA Rocky Mountain Region
- Connection point (POI)
- Lost Canyon - Shiprock 230-kV
- Technology
- Solar: 765 MW
- Total requested
- 765 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 22 October 2021
- Proposed online date
- December 2023