BATTERY STORAGE Β· ERCOT

Port Bay ESC

Port Bay ESC is a 200 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0280
Grid region
ERCOT (Texas)
Developer
FRESH AIR ENERGY II, LLC
Connection point (POI)
8434 Rockport Substation (ROCKPORT4A) 138kV
Technology
Battery: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 March 2022
Proposed online date
June 2027
Withdrawn
October 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem