Oceanside Energy Center

Oceanside Energy Center is a 330 MW other request withdrawn in the NYISO interconnection queue, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
74
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
FPL Energy, LLC
Connection point (POI)
Barrett
Location
New York
Technology
Other: 330 MW
Total requested
330 MW
Queue status
Withdrawn
Entered queue
10 October 2000

Location

No county location in the queue data.

Power plants in New York Β· Transmission lines in New York

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem