SOLAR Β· SOUTHEASTSolar project 187
Solar project 187 is a 74.5 MW solar request built and operating in the Southeast interconnection queue, connecting to Florida Power & Light.
Request details
- Queue ID
- 187
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Sunshine Sub
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 18 April 2016
- Came online
- January 2020
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
- Solar project 605, Desoto CountySolar Β· 74.9 MW Β· in study
- Solar project 604, Desoto CountySolar Β· 74.9 MW Β· in study
- Solar project 473, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 413, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 475, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 434, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 430, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 471, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 521, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 429, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 476, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 477, Desoto CountySolar Β· 74.5 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem