United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR + STORAGE Β· PJMSolar + storage project AG2-528, Rockbridge County
Solar + storage project AG2-528, Rockbridge County is a 140 MW solar + storage request withdrawn in the PJM interconnection queue, in Rockbridge County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-528
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Sunday Solar LLC
- Connection point (POI)
- Bustleburg Tap - Fairfield DP 115 kV
- Location
- Rockbridge County, Virginia
- Technology
- Solar: 140 MW Β· Battery
- Total requested
- 140 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- October 2024
- Withdrawn
- June 2025
Location
Marker shows the centre of Rockbridge County; the queue data does not give exact sites.
Other requests in Rockbridge County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem