United States › Grid › Interconnection queues › Virginia

ONSHORE WIND · PJM

Highland New Wind

Highland New Wind is a 39.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Highland County, Virginia, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2004 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
N07
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Monterey 69kV
Location
Highland County, Virginia
Technology
Wind: 39.0 MW
Total requested
39.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
28 September 2004
Proposed online date
April 2021
Withdrawn
March 2020

Location

Marker shows the centre of Highland County; the queue data does not give exact sites.