United States › Grid › Interconnection queues › Virginia
ONSHORE WIND · PJMHighland New Wind
Highland New Wind is a 39.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Highland County, Virginia, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2004 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- N07
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Monterey 69kV
- Location
- Highland County, Virginia
- Technology
- Wind: 39.0 MW
- Total requested
- 39.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 28 September 2004
- Proposed online date
- April 2021
- Withdrawn
- March 2020
Location
Marker shows the centre of Highland County; the queue data does not give exact sites.
Other requests in Highland County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem