OTHER Β· PJMOther project AA1-035
Other project AA1-035 is a 60.0 MW other request withdrawn in the PJM interconnection queue, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2014 (completed)
- Withdrawn / abandonedMar 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA1-035
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Edgecomb-Roanoke Valley
- Technology
- Other: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 1 August 2014
- Withdrawn
- March 2016
Location
No county location in the queue data.