United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Barranca Wind III

Barranca Wind III is a 205 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0376
Grid region
ERCOT (Texas)
Developer
Barranca Wind Energy, LLC
Connection point (POI)
tap 345kV 80307 Delsol - 80225 Cenizo
Technology
Wind: 205 MW
Total requested
205 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
26 June 2019
Proposed online date
September 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem