United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project R63, Calhoun County
Onshore wind project R63, Calhoun County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Calhoun County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2009 (completed)
- Withdrawn / abandonedFeb 2012 (project stopped here)
- ConsentedFeb 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R63
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Raun - Lehigh 345 kV
- Location
- Calhoun County, Iowa
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 8 April 2009
- Agreement signed
- 15 February 2012
- Proposed online date
- December 2010
- Withdrawn
- February 2012
Location
Marker shows the centre of Calhoun County; the queue data does not give exact sites.