SOLAR Β· SOUTHEASTSolar project GI-124, Vernon County
Solar project GI-124, Vernon County is a 200 MW solar request withdrawn in the Southeast interconnection queue, in Vernon County, Missouri, connecting to Associated Electric Cooperative, Incorporated.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-124
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Associated Electric Cooperative, Incorporated
- Connection point (POI)
- Camp Clark 161 kV
- Location
- Vernon County, Missouri
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 9 December 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Vernon County; the queue data does not give exact sites.
Other requests in Vernon County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem