United States βΊ Grid βΊ Interconnection queues
OTHER Β· PJMOther project W3-065
Other project W3-065 is a 500 MW other request withdrawn in the PJM interconnection queue, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2010 (completed)
- Withdrawn / abandonedApr 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W3-065
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Braidwood-Cook
- Technology
- Other: 500 MW
- Total requested
- 500 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 22 September 2010
- Withdrawn
- April 2013
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem