ONSHORE WIND Β· WEST

Onshore wind project 2021-G2

Onshore wind project 2021-G2 is a 202 MW onshore wind request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2021-G2
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Beaver Creek - Deering Lake 115-kV
Technology
Wind: 202 MW
Total requested
202 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
19 February 2021
Proposed online date
December 2024

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem